TRANSFORMERS
CIRCUIT BREAKERS
GENERATORS
MOTORS
ACCEPTANCE &
MAINTENANCE TESTING
Any process-driven industry benefits from routine maintenance testing of their electrical power system. Acceptance testing confirms the proper installation and that the equipment is free from factory defects before you are depending on it for your profitable manufacturing. Downtime affects valuable profits and delivery timelines. Testing to ensure your electrical power equipment is in optimal condition is a small price to pay compared to a disruptive unplanned outage.
ARC FLASH STUDY
Understanding the potential for an arc flash allows the facility equipment to be labeled with appropriate identifiers, including the potential incident energy available at each device or piece of equipment, the appropriate PPE required to protect the individuals that will be in contact or working with the equipment in question.
LOAD STUDY
A load study gives the individuals working with or around the facility equipment an accurate understanding of the amount of current present and the locations that are the most and least heavily loaded within the facility.
DEVICE COORDINATION
Device coordination concerns employee safety and making sure that the device settings are quick enough to minimize fault time and will allow the potential fault to clear as quickly as possible. This also will assist in minimizing property damage.
SHORT CIRCUIT ANALYSIS
Destructive energy from a short circuit can be mitigated by conducting a coordination study and by increasing the protection available to persons by completing the arc flash hazard analysis.
ENGINEERING STUDIES
TESTING
Amazon Fulfillment Center
Acceptance testing on the new facility located in Huntsville, Alabama.
BASF
Twelve years of support at BASF Huntsville, acceptance testing, maintenance testing, power quality analysis and emergency support services.
Bunge North America
Performed electrical systems upgrades
to microprocessor controls. Networked metering system to allow each business unit to see their individual power consumption. Arc flash, coordination, and short circuit studies.
Camp Lemonnier
Djibouti, Africa
Through the Corps of Engineers, AMP helped facilitate the upgrade to the backup power systems for the United States Naval Expeditionary Base, Camp Lemmonier.
Carpenter Technology Corporation
AMP performed the acceptance testing during new construction and engineering studies (arc flash, coordination, short circuit analysis) for the data center.
Carpenter Technology Emerging Technology
Performed acceptance testing and system load studies for North America’s most advanced additive manufacturing facility.
Daikin America
Daikin America has depended on AMP Quality Energy Services for emergency services, maintenance testing, and acceptance testing for many years.
DaikyoNishikawa Corporation
Automotive manufacturing feeder plant to MTMUS, performed acceptance testing during construction and startup. Conducted Short Circuit Study to assist in making foreign manufactured production machines adhere to NFPA National Electric Code.
Federal Bureau of Investigation
Acceptance testing and light dispersion survey.
Georgia Pacific
Maintenance testing at multiple sites in the Southeast.
Hudson Alpha Institute for Biotechnology
Arc Flash, coordination, and short circuit analysis engineering studies. Power load surveys to facilitate expansion.
Mazda Toyota Manufacturing
Performed Acceptance testing on the paint shop and data center. Continued support for MTMUS maintenance team.
Metro Water Services
Multi-year maintenance testing contract with the City of Nashville Metro Services.
Nashville Soccer Club Stadium
Acceptance Testing contract for the innovative new Nashville Soccer Club Stadium.
NATO Headquarters Brussels, Belgium
AMP supports the United States Department of State Bureau of Overseas Building Operations in many parts of the world. One such project was the United States wing of the NATO headquarters building.
Nektar Therapeutics
Routinely perform ground testing for laboratory static ground plates. Acceptance testing and multi-year maintenance testing intervals.
Packaging Corporation of America
Maintenance testing and upgrade legacy
systems to microprocessor electrical controls.
United Launch Alliance
AMP has been blessed to partner with United Launch Alliance for over ten years providing maintenance testing and certifying their DOD ground points throughout the facility.
VUTEQ
Automotive injection molding facility needed foreign manufactured process equipment listed for service. AMP engineered the electrical installation to reduce fault current to meet the process equipment requirement.
Wayne Farms
Multi-year support for all phases of the chicken processing from Hatchery, Feed Mill, Kill Plant, and Further Processing.